Installation of electrical conduits, accessories and boxes :
Normally using three types of conduits.
1. EMT conduits - Electrical metallic tubing
2. PVC conduits - poly vina chloride
3. Flexible conduits.
What are the equipment and machinery required for installation?
Electric grinder - cutting of support elements
Bending spring - bending pvc pipes
Heat gun - softening pvc pipes before bending
Hack saw - cutting of pvc / EMT pipes
EMT pipe bending machine - bending of EMT pipes
Round file - removing the burr from cuts
Drilling machine - Drilling for anchors
Line dori, marker pen, plump line - marking for conduit route.
Hand tools - hammer, screw driver, spanner set etc.
Concrete hole saw cutter - coring hollowcore slabs
General and procedure for installation :
Size of conduits to be used shall be as per the drawing
Conduit shall be inspected before installation, and if not smooth inside and outside, free of flows and imperfect of any kind, it shall not be installed.
Ensure that joiint connections are smooth and such that no damage is caused to cables or conduit system during installation.
Size of conduits 20mm and 25mm and 32mm.
Conduits must be secured outlet boxes, junction boxes, or cabinets by placing locknuts on outside of box and locknuts and busing in the inside of box.
Conduit runs must be mechanically and electrically continous, and water tight.
There will be no welding of conduits or any other conductor raceway to steel structures.
Run conduits in square, symmetrical lines, parallel to or at right angles to the wall and in accordance with the accepted practices.
Do not support conduits with wire or perforated pipe straps.
Cut conduits using hacksaw, de-burr cut ends by hand round file.
On straight runs, inspection boxes /draw in points must be installed every 10m.
Provide suitable fittings to accommodate expansion and deflection where conduit crosses expansion joints.
All runs shall be supported at no more than 1200mm. Where directional changes occur support shall be provided at no more than 150mm either side of the bend.
Only continuous length of buried conduits shall be installed between boxes, no joints boxes being allowed in the floor screed.
Keep conduits at least 100mm or 150mm from pipes and other non electrical services.
Whenever metallic tubing are connected to trunking or cable tray, male bushing and necessary access shall be used.
PVC conduits buried in plaster shall have 6mm depth minimum of cover over its entire length.
PVC conduits buried in screed shall have 20mm depth minimum of cover over its entire length.
Flexible conduits to equipment shall be terminated in the conduit fitting. The final connection being made with appropriate adoptable flexible connector.